Paving Impacts: Here are some tips and things to be aware of when paving is happening in and around your neighborhood.

·  Construction equipment and noise. You may see heavy equipment going in and out of your neighborhood. This may result in "construction type" noise.

·  You may experience some traffic delays due to lane restrictions. We apologize for any inconvenience this may cause.

·  We may have to come back to stripe.  Construction takes time, sometimes several days.  Often we have to come back the next day, or even several days later to complete a project. For example, we may wait and stripe several streets at the same time. This saves staff time and money, but may mean your street doesn't get striped right after it is paved. We are committed to getting each project done in a timely and efficient manner.

·  Access to your driveway may be temporarily disrupted.  Crews will work with citizens whenever possible to help you get in or out of your driveway.

·  Don't park on the street the day of paving.  Vehicles parked on the street during resurfacing work will be towed at the owner’s expense. A day or two before work occurs, the Contractor will place “No Parking” signs on the streets to notify you.

·  Watch and obey flaggers. They are there to protect you and construction workers.

·  We sometimes arrive early in the morning. Contractor’s crews work Monday through Friday, 7:00 a.m. to 6:00 p.m., excluding holidays.

·  If you have a Question or a Problem please do not hesitate to contact the Engineering Department promptly at (330) 830-1722.  Don’t let the question or problem go un-noticed. It is often much easier while the Contractor is on site to remedy any problems.  

Frequently Asked Questions:  Here are some frequently asked questions that we get about paving. Can't find your question listed below, just e-mail us. We are here to help.

·  How can I find out if my street will get paved?  Every other year we do a comprehensive rating of all streets located within the corporation limits.  Based on the ratings and the current years paving budget a list is complied and is submitted to the Administration for approval.  

·  Can I drive on a freshly paved road? With asphalt, you may have to wait a few hours before driving on it. Please WATCH and OBEY Construction Workers.  

·  Will every street in the City of Massillon get a new surface? Yes, since the inception of the resurfacing program in 1988 we have tried to resurface every street at least once. View the STREET PAVING LIST 1988 TO 2007 here. About 8 to 10 miles of streets will get new surfaces each year. You may view our STREET PAVING CAPITAL IMPROVEMENT COSTS here.  

·  How much would it cost to resurface all of Massillon’s streets?  Over $121 million dollars for the asphalt pavement resurfacing only. We have more than 184.813 miles of City streets. Click here to view the City of Massillon’s Infrastructure web page.